Quantcast
Channel: SCN: Message List - Enterprise Asset Management (SAP EAM)
Viewing all 10043 articles
Browse latest View live

Re: How to make fields in PM Notification Screen Mandatory?

$
0
0

Tcode OIAL.

Plant Maintenance and Customer Service-Maintenance and Service Processing-Maintenance and Service Notifications-Notification Creation-Notification Types-Set Field Selection for Notifications-Field Selection for Maintenance Notifications


Re: PM Order Object list not updating after order release

$
0
0

Not able to update object list. I am able to enter equipments, FL Notification but entries are not getting update during save of MO.

untitled.JPG

Re: Error in IFCU

$
0
0

spro 

Information Systems for Plant Maintenance and Customer Service- 

Configure Measurement Document Update

Re: PM Order Object list not updating after order release

$
0
0

everything is fine as per screen shot. what you are expecting?

Re: PM Order Object list not updating after order release

$
0
0

Not able to update object list. I am able to enter equipments, FL Notification but entries are not getting update during save of MO.

Message Control for PM-Notifications

$
0
0

I tried defining few of the standard messages delivered by SAP for maintenance notifications as Error, warning etc in SPRO path: Maintenance and service order-->Message control. When I logged in and try to create a notification to reflect those messages, there is no change or the message is not at all displayed.

Can someone let me know how do i achive this in SAP using standard message control and how to do I know which messages are hard coded by SAP.

 

Thanks

Murad

Re: Presentation issue with Work Order transactions - bottom of screen area empty after patching

$
0
0

Greetings Jefri,

 

I believe that in SE51 you need to check the attributes for program SAPLCOIH, screen 1100 tab  TS_1100

 

But best refer to your ABAP team for this one.

 

se51.PNG

Preventive maintenance order is coming before due date

$
0
0

Dear Experts

 

There is performance based strategy plan with cycle set (250 hrs, 500 hrs,750 hrs,100hrs).

Last order release & completed on date 13.09.2012 with counter reading 2377 hrs.So next order should be generated on after 250 hrs (i.e. at 2627 hrs.).

But system has released an order after 170 hrs at counter reading 2547.

Please Guide how this issue can be overcome.

 

Thanks in Advance.


Re: Warranty Requirement questions

$
0
0

You create 2 Master Warranties and attach to Equipment.

 

 

1 Customer Warranty - create 2 service line items

i)  Service warranty to coincede with Manufacturer Warranty.  Use a counter of 730 days if it's for 2 years.

ii) Customer Warranty

use a counter of 730 days plus either 365, 730 or 1095 days depending on which extended warranty option is purchased by the customer.  Within the equipment, you set a start date the same as the expiry date of the  Manufacturer warranty.

 

 

2 Manufacturer/Vendor Warranty - also create 2 service line items

 

 

i) Vendor Warranty. Use a counter of 365 days for  1 year.

ii) Manufacturer warranty.  Use a counter of 730 days if it's for 2 years.

 

 

For inheritance of Manufacturer warranty from superior objects.  SAP automatically performs a check on both current object and two levels above.  Current object takes precedent.

Re: Preventive maintenance order is coming before due date

Re: Preventive maintenance order is coming before due date

$
0
0

Can you please send a screen-shot of your Scheduling Parameter data from IP03, also a screen-shot of IP10 for that plan.

 

PeteA

Re: How to enable operation confirmation in %

$
0
0

Its not perfect, but we used the Reason code in IW41 to track progress.

 

This allowed the user to enter a time confirmation and progress in one transaction.

 

PeteA

Re: CLSD status

$
0
0

Yogesh,

 

I doubt it - although I haven't tried.

 

The BS23 settings forbid the setting of the following:

NCMP.jpg

 

And you certainly don't want to change these settings. Even if you did, you may get caught out by the ABAP code checks..

 

PeteA

work center wise cost report

$
0
0

Hi All,

 

In my case ,main work center & operation work center(used under operation tab) is different.

Is there any t-code available to view cost incurred against each operation work center for a

period in maintenance order.

thanks in advance.

rgds

pranjal

Re: work center wise cost report

$
0
0

Hi Pranjal

 

Greetings. You can get list of order/operations with selection criteria of PWC in standard report -IW37n. However the cost showing here will be that of orders not of operations. cost breakups displayed in maintenance orders is as per your customisation under SPRO-PM & CS->maint & service processing->basic setting-> setting for display of cost->maint valuation catagory then assign cost element to valuation catagorie..

Hence cost collected is at order level as per different valuation categories & cost element assignments.

 

regards

 

Shakti


Re: Could not dismantle superior Equipment -IE02-INST

$
0
0

Thanks a ton yogesh, I have dismantled successfully by using this report RISTEQ04.

 

Great thanks once again.

 

Zubair

Re: work center wise cost report

$
0
0

Not unless:

  • You are using Operation Level Costing (plenty of posts on this). Even then you may have issues as you can confirm many different work centres to the operation which may have the same cost centre.
  • You have different cost centres for each work centre, if so, then have a look at the Rep Plan/Act button on the Cost tab in the order. Also see TCode KKBC_ORD_INT or http://www.sapfans.com/forums/viewtopic.php?t=170009

 

PeteA

Re: Preventive maintenance order is coming before due date

$
0
0

Thanks to all experts for response.

 

As Mr. Thyagrajan & Mr. Yogesh suggested there exist a wrong measurement document with reading 21,838 hrs on dated 26.09.2012 resulting in a release order before due performance.

THANKS A LOTfor Mr. Thyagrajan & Mr. Yogesh for their valuable response.

my issue is solved

now how to get new order on desired date (11.01.2013, reading (2630 hrs)).

 

Best Regards

Pravin Gautam

Re: For Order types+Shop paper+ to be made user specific

$
0
0

Hi,

 

Fine,

 

I have found for a user, this user specific setting in not maintained in OIDH/OID3, both in Quality System and Production System.

 

In Production System, no issues, he can print the Shop paper for the Order.

 

In Quality System, he is facing this error message "ID612 - NO USER SPECIFIC SHOP PAPERS ARE DEFINED"

 

Is there any User specific setting.

 

Suggestions please.

 

Raja

 

In Production, while creating a Order and released and printing

Re: Preventive maintenance order is coming before due date

$
0
0

hi

 

i think you can have manual call from IP10 on 11.01.2013 but it will be for measurement document on that day

 

Sorry you can't have manual call on past day. either you can create order with start date in past ,

 

Regards

Thyagarajan

Viewing all 10043 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>