Re: PM WO complete but PR not gone (not deleted)

$
0
0

Hi,

I have also similar issue.I checked in KO88, PR cost is relfecting there.What could be the reason & how we can resolve it?

 

rgds


SHEDULING PARAMETER IN MAINTENANCE ORDER.

$
0
0

Dear All,

 

i am new to this community please suggest me regarding consumption order in iw31.

 

i have created a consumption order for regular consumption of materials in equipment.

 

suppose i created an order on 28.10.2012 and i gave the basic start date 01.10.2012, so accordingly my first operation start will be 28.10.2012. and i chose the component in component tab on same date(means 28.10.2012) so my requirement date will be 28.10.2012. and next day(29.10.2012) i chose one more component for the same operation. then my requirement date of previous component changes to 29.10.2012,

 

please suggest me so that my previous day reservation requirement date should be previous date and current date requirement should be current date.

 

thanks

 

sachin mehndiratta

Re: Inconsistant PM Order Screen areas

$
0
0

Hi SAP PM,

 

Thanks for your response. Will come back after checking with my Basis Team. BR.... J K.

Mail for notifications in SAP inbox

$
0
0

Dear Experts,

 

 

I have a requirement that once user creates and save the notification a mail should be trigger to SAP inbox.Please let me know what are the configuration required to meet the requirement.

 

 

Thanks in advance,

Nitin

 


SHEDULING PARAMETER IN MAINTENANCE ORDER.

$
0
0

SHEDULING  PARAMETER IN MAINTENANCE ORDER.

 

 

 

Dear All,

i am new to this community please suggest me regarding consumption order in iw31.

i have created a consumption order for regular consumption of materials in equipment.

suppose i created an order on 28.10.2012 and i gave the basic start date 01.10.2012, so accordingly my first operation start will be 28.10.2012. and i chose the component in component tab on same date(means 28.10.2012) so my requirement date will be 28.10.2012. and next day(29.10.2012) i chose one more component for the same operation. then my requirement date of previous component changes to 29.10.2012,

please suggest me so that my previous day reservation requirement date should be previous date and current date requirement should be current date.

thanks

sachin mehndiratta

Mail  for notifications in SAP inbox

$
0
0

Hi Nitin, I am not on the system, no special config required - we need to use the standard SAP work flow tasks and you need to trigger a mail to a identified person ( you have not mentioned the logic in the above requirement) on every notification create event.

Hope it helps you, if further help required come on net meeting on monday. Give clarity of the same

Re: SHEDULING PARAMETER IN MAINTENANCE ORDER.

$
0
0

Check the Scheduling Parameters.

 

IMG - PM & CS - Maintenance & Service Processing - Maintenance & Service Orders - Scheduling - Scheduling Parameters

 

Check the option as Do not change dependent requirements.

Re: SHEDULING PARAMETER IN MAINTENANCE ORDER.

$
0
0

Hi,

 

Check the setting in ADJUST DATES under

 

 

IMG - PM & CS - Maintenance & Service Processing - Maintenance & Service Orders - Scheduling - set Scheduling Parameters

 

and make the entry as

 

" Do Not Adjust basic dates, dependent requirements, to order start"


Re: Estimated cost

Re: Estimated cost

$
0
0

IMG - PM & CS - Maintenance & Service Processing - Maintenance & Service orders - Basic settings - Settings for display of costs - Define version for cost estimates for orders

 

Check in OKEQ also for the Cost Estimate Configuration for Maintenance Order.

Re: Equipment data not getting changed while IE4N

$
0
0

HI Ketul,

 

Rightly said that the fields are manually entered so not getting updating, 

I will try for some enhancements

Re: Estimated cost

$
0
0

Yes. Only in creation mode and not in change.Only in IW31.

Re: Estimated cost

$
0
0

Thanks Maheswaran....Problem solved now.

Enter old Malfunction notification From 1982

$
0
0

Hi Expert,

 

Requirement is to enter all malfunction notification for equipment from year 1982, but system gives error

Malfunction start only allowed from date 25.01.1998

Message no. IM490

 

Pl. provide solution for same.

 

Thanks,

Santosh

Re: Enter old Malfunction notification From 1982


Re: Accounting indicator

$
0
0

Hi

 

We did this a number of years back by a user-exit at order SAVE (IWO10009).

 

PeteA

CM 34 - How to change the profile

$
0
0

Hi

When I run CM34, the system defaults the Overall Profile as SAPPM_G005. I have two questions:

1) How could I chjange the deafult?

2) Is there a way to select a different overall profile within the transaction?

Regards

Goraj

Re: Error in IFCU

$
0
0

hi

 

Just try with gas station GT in IFCU

 

Regards

Thyagarajan

How to make fields in PM Notification Screen Mandatory?

$
0
0

Folks

I am looking for a while in IMG for setting some of the fields like Mw.WorkCenter, Maint Plant, Planner group, Planning Plant as mandatory in Notification screen. To my bad luck, I wasnt able to find any relevant settings in SPRO.

Tried searching in previous blogs ,forum but to no avail, there is any blog with correct answer.

Though it looks too simple but I couldnt find a way even after hard try,

Let me know if any one has done similar stuff earlier thru SPRO or a way out to achieve it

 

Regards

Murad shaikh

Error in IFCU

$
0
0

Thanks yogesh,

Its running....by mistake I made other material as default,now please clarify one more thing that when I run MCIZ report the report is coming like this

 

screen 4.JPG

The value of operating hour is not coming here,although in IFCU  I have maintain the counter reading of distance