Adding custom field on PM notification screen
Dear Expert, I'd like to add a specific field, i.e. PM Order reference, on my refurbish notification screen to do reference the PM Order that generated this demand to workshop, so I' like to know how...
View ArticleRe: System Status NOPR and User Status WAPR
Dear,sorry i tried to send you direct message but i can't i need to ask you about another thing i need to change the main work center entered in error , but the work order approved and RSCHi changed...
View ArticleRe: components in DP90 billing request
Hi Alex Have maintain DIP profile (ODP1), If you have maintain the DIP, pls check material Determination and SET ID (Cost Element) in DIP Christin B
View ArticleRe: components in DP90 billing request
Here, you are talking about material without cost. That thread talks about Internal activity without activity price. In both cases, costs will not get updated into Service order. So, you can't bring...
View ArticleRe: components in DP90 billing request
Alex, Since there is no costing info for a TEXT item, I therefore think you will need to develop a solution for this. Have a look at the PDF document within OSS Note 301117. PeteA
View ArticleRe: Document missing in the reference Equipment Master after New Equipment...
Sekar. How are you creating these new equipments? PeteA
View ArticleRe: Document missing in the reference Equipment Master after New Equipment...
Hi Sekar, I could understand that you are creating the Equipment through IE01 using Reference Equipment field and then checking everything for Copy in the pop-up.But I am not clear about the Documents...
View ArticleRe: Document missing in the reference Equipment Master after New Equipment...
Hi, I am creating the Equipment through IE01 with reference Equipment. Selecting 'All' sub- objects in the pop up. Regards,Sekar.
View ArticleRe: Document missing in the reference Equipment Master after New Equipment...
Hi, I am trying copy the DMS document which is attached in the reference Equipment. Regards,Sekar.
View ArticleRe: Document missing in the reference Equipment Master after New Equipment...
Hi Sekar, I've just verified. This is a real observation.I do not know whether there is any specific reason for this arrangement or just a bug.You might have noticed that, if we do not check the...
View ArticleRe: Adding custom field on PM notification screen
Dear Peter, In this standard way, Service for object, I can't select a different PM Order... I'd like insert/enter any Order that I think is related with those PM notification.
View ArticleMaintenance Scheduling Discrepancy Between Production and QAS
Hi all Would anyone know what’s causing the Production system to behave different to QA system vis-à-vis maintenance plan scheduling? I have a time-based strategy plan with the following packages:...
View ArticleRe: Maintenance Scheduling Discrepancy Between Production and QAS
Hi Yinka, One thing is coming out.Some setting in PRD which prevents Calls in the past . Compare OPU7 screens Jogeswara Rao K
View ArticleRe: Maintenance Scheduling Discrepancy Between Production and QAS
See the post above. I've attached the OPU7 spro screen
View ArticleRe: Creation of breakdown order only from the breakdown notification
Hi Pete, Thanx for your reply. Surely I will try. warm regards, Parag
View ArticleRe: Table showing action log in equipment master IE03.
Hi, All status change logs are in JCDS table. Sincerely Ümit
View ArticleRe: Maintenance plan Scheduling Status
This is SAP standard behavior. Only in IP30, orders will be created automatically in background. As you are scheduling manually in IP10, you should save the scheduling to create the order.
View ArticleRe: Creation of breakdown order only from the breakdown notification
Always do some basic search before posting any query. Just by searching in 2 min, if we could give some useful links, why can't be possible for you??
View ArticleRe: New Infostructure
Hi Pranjal, An Info structure can not be compared to an ALV.You can compare a PMIS report to an ALV.You can compare an Info structureto a Transparent Table. So you can ask like this1.Why we need...
View ArticleRe: Maintenance Scheduling Discrepancy Between Production and QAS
Jogeswara You're definitely be onto to something here as there's a difference in OPU7 between the two: - the Start in the past parameters is blank in QA but set to 0 in PRD which is why PRD is ignoring...
View Article