Re: PRT Preview Print from Service Order

$
0
0

Hi Maria,

Thanks for your reply.

I am using document as PRT. I have seen separate shop paper for PRT Preview in Production order. so just trying to get the similar from service order also.


Re: Sub-operation CNF in PM order

$
0
0

But as sub operations r more,it takes much time to CNF all. If only main operation CNF,order status becomes PCNF. There r lot orders which End user has to CNF.

 

Is there any other way except CNF all Sub-operations..?

Re: Transfer Variant

$
0
0

Although the parameter is set the system of a client sets the last used transfer variant by default in transaction ABUMN. The first time the parameter is set it works, the next time not.

Do you experience the same behavior or have a hint on how to avoid it?

 

Thank you for your feedback!

Re: Clearing of Work Permit

$
0
0

Hi Praneet,

 

How are you using Work Clearance Management in client's business ?

 

Whether this was created without any reference with work order or is there any connection, you cannot change the status to TECO unless the permit can be completed.

 

Since if the Work order is related to permit, and if it is set to Approve in Work Order Teco status, then i dont see there is a gap. In the permit you can maintain approval workflow, who has to approve it.

 

As per the information, I feel there is a gap in the business process and sap, it can be easily filled. Kindly provide your business process, so it can be easy to say how it can be mapped with SAP.

 

Regards

Terence

Re: Sub-operation CNF in PM order

$
0
0

Hi Anil,

 

Whether you can do confirmation in IW42 / IW44 / IW48

 

Regards

Terence

Dependency

$
0
0

How do I configure this dependency and assign it to class

 

Dependency

 

The following dependencies are required:

 

 


 

Name


 

 

Calc


 

 

Assigned to Class


 

 

Total Capital Cost


 

 

Populate the
  characteristic MP_CAPITAL_COST with the sum of the following allowing for
  nulls:


 

 


 

   

MP_CAPITAL_COST_CAMPS


   

   

MP_CAPITAL_COST_HUTS


   

   

MP_CAPITAL_COST_ROADS


   

   

MP_CAPITAL_COST_SIGNS


   

   

MP_CAPITAL_COST_STRUCTURES


   

   

MP_CAPITAL_COST_TRACKS


   

   

MP_CAPITAL_COST_VISITORCENTRE


   

 

 


 

 

MP_PROJ_ITEMS


 

 

Project Total


 

 

Populate the
  characteristic MP_CAPITAL_COST_CONTINGENCY with the sum of the following
  allowing for nulls.


 

 


 

MP_CAPITAL_COST


 

MP_CONTINGENCY


 

 

MP_PROJ_ITEMS


 

Catalogue Codes/ Pick list

$
0
0

Hi

 

How do I configure this and assign it to notifications

 

Catalogue Codes
/ Pick Lists

 

 

Changes to existing pick list for Priority and User Status fields:

 

 

 

 

 


 

Priority


 

 

Unallocated


 

 

 


 

 

Reactive


 

 

 


 

 

Medium/Minor


 

 

 


 

 

Large/Complex


 

 

 

 

 

 


 

User Status


 

 

PROP - Proposed


 

 

 


 

 

IBCS - IBC Started


 

 

 


 

 

DBCS – DBC Started


 

 

 


 

 

IMPL-Implementing


 

 

 


 

 

CLSD - Closed


 

 

 


 

 

REVD - Reviewed


 

Re: How to assign and validate multiple warranties for an equipment at Notification or Maint Order

$
0
0

Hi All,

 

Requesting you all to provide some direction towards solution!

 

Regards,

N.Nagaraju


Re: Vendor details in equipment master

$
0
0

Hi Satish

 

Four ways I can think of:

 

1. Serialise the equipment, so it's full transaction history, including GR from PO is available as part of the equipment record

 

2. Use Warranties - a warranty is by vendor (or customer) and by assigning the master warranty to the equipment, you have a link to the vendor

 

3. Activate sub-screen 050 in your equipment master, in the IMG via the View Profile assigned to your Equipment category. This screen includes a Vendor field. You can hide the other fields on this sub-screen if you don't want to see them, in the IMG for Field Selection for Equipment

 

4. Assign function VN to the Partner Determination Procedure your Equipment Category uses and capture the vendor as a Partner to the equipment

 

#1 will record vendor automatically.

#2,3,4 require user to manually assign.

 

Regards

Re: Catalogue Codes/ Pick list

$
0
0

Catalog-Codes through Tcodes QS41, OQN6

See this document: Catalog Profile

 

 

Priority

Through this SPRO path

priority.JPG

 

 

 

User Status

Through this SPRO path

user status.JPG

Re: Dependency

$
0
0

Create/ Change Characteristic  and Dependency > Tcode CT04

Create your characteristic through CT04 as under and while creating you can Assign/Create and Assign the Dependency by clicking on the icon shown. Or you create Dependency through Tcode CU01 first and then create a Characteristic and assign.

ct04.JPG

 

The dependency editor shown below will have a code, for which you will have to do some research or take help of ABAPer.

Dependency.JPG

 

Go through this document to know how this Dependency code is written and works. Configurable Tasklist

 

 

Creating a Class Tcode CL02

Now after creating all such required characteristics, you use Tcode CL02 to create a CLASS and there you assign these Characteristics in Char. Tab. You should be clear about the Class type (see the drop-down list in CL02).

 

cl02.JPG

 

Beyond this I think you have to help yourselves.

 

Good luck

KJogeswaraRao

Re: Inspection lot not getting generated for Caliberation inspection

$
0
0

J.Balakrishnan

 

Do you mean that the system isn't generating an order?

 

Also can you please send an IP10 screen-shot of your maintenance plan.

 

PeteA

Re: change of cycle in task list operation

$
0
0

Pranjal Bora


Can you please send an IP10 screen-shot for the plan.


PeteA

Re: Inspection lot not getting generated for Caliberation inspection

$
0
0

Hi Peter,

 

Order is generated, but inspection lot is not getting generated when the maintenance plan is scheduled.

Re: Sub-operation CNF in PM order

$
0
0

Hi PeteA,


Thnx a lot for ur reply.


As u said only "batch program" will be an option to CNF all sub-operations,once main operation CNF'd.



Regards,

Anil Bhardwaj


Re: Inspection lot not getting generated for Caliberation inspection

$
0
0

Is the order released (REL)?

 

PeteA

Re: Fuel Consumption Fleet-wise

Re: Inspection lot not getting generated for Caliberation inspection

Re: Exam study

Re: Dependency

$
0
0

Thank you very much Jogeswara Rao Kavala. It was very very helpfull. We are able to create a notification. By the way I was in India for 10 years studing at Pune University. Shekuran