Re: Iw42 --services button
Hi, You cannot confirm external services with transaction IW42. Only internal services can be used. For external services you can use transaction ML81N. -Paul
View ArticleRe: MRP Run based on material reservation and material type.
Create New MaterialAssign MRP type as PDCreate one Maintenance Order for that materialReservation will be createdNow run MRP in MD02 for that materialIt will generate PR Get the inputs from your PP /...
View ArticleRe: Iw42 --services button
yes Paul either through ml81 or through me58(against pr generated for Frame wo) . But what is internal services ?
View ArticleRe: Iw42 --services button
Well it is basically to use PM05 control key for using services from service master
View ArticleRe: Iw42 --services button
In standard SAP, PM03 control key will be used for External Services. Service entry sheet for External Service should be created only in ML81N. For Internal Service, PM05 control key should be used....
View ArticleRe: Update text from Std text key in task list
Hi Pete, Thanks for the quick reply.I could not find a table where the long text (Task list operation long text) is getting updated.Please help. RegardsSurya
View ArticleMultiple Equipment's with single Materiel Number and Serial Number Combination
Hi Team, Today while I was testing I was able to create more then one equipment record based on the same serial number and materiel number combination. Do you think it is possible in SAP. My...
View ArticleRe: LSMW Recording for IW34 returns error when run in background
As a first step to investigate, re-confirm for the entry '3' in table T356, execute Tcode SE16 with value T356 and see the match-code(F4 help) in PRIOK field. See whether '3' is there in the value-list...
View ArticleRe: Multiple Equipment's with single Materiel Number and Serial Number...
Hi Vimal / Pete, There is a flag SERUNI in table T399J that could allow non-unique serial/material combinations. But it looks like this is not used and is now redundant. See note 70362 which references...
View ArticleRe: Forecasting of Material & Labour from Maintenance schedule
Labor Capacity Load as well as Material requirements list will be arrived from PM orders. So if no PM order has been generated, then you can't forecast those requirements.
View ArticleRe: Plant maintenance work setup
When the people are having time to answer, the responses will come automatically. Permits can be used in PM module as well. If you can elaborate your query, responses can be appropriate.
View ArticleRe: Forecasting of Material & Labour from Maintenance schedule
1.if you want to forecast these figures ( manpower and material cost) through standard reports, you need to schedule the plans for a 'scheduling period' equal to the time of forecast (with no call...
View ArticleRe: New system status
Are you using Log Book functionality?? If yes, check the link. http://help.sap.com/saphelp_rc10/helpdata/en/5e/0eb540efe68631e10000000a1550b0/frameset.htm
View ArticleRe: IP43 Multiple counterplan"POSTING_ILLEGAL_STATEMENT "
Check the Run time error in ST22 & check the same with ABAP consultants.
View ArticleRe: How do I create one maintenance strategy for same equipment type,...
As you have 5 pumps, I hope you will be creating 5 separate equipments & one Maintenance Plan with 5 Maintenance Items. First 3 pumps (from Supplier A) will have 4 internal activities & 2...
View ArticleRe: How do I create one maintenance strategy for same equipment type,...
3 pumps (P1/ P2/ P3) from supplier A. Activities: 4 internal & 2 external. Frequency = 3M.2 pumps (P4/ P5) from supplier B. Activities: 4 internal & 1 external. Frequency = 3M. You already...
View ArticleRe: Revision Field in Notfication
Same issue was disucssed very recently at the following thread. http://scn.sap.com/thread/3356788 Check whether the inputs available here are of some help to you. Jogeswara Rao K
View ArticleRe: How to Add Fund center in Maint Order Tab
Hi Ashu, I assume that you have implemented the fund managment(Public sector) for your company code. You could follow the below points to work in fund center 1. Create the Fund center and...
View Article