Re: Need Info on BADI/ FM/ Enhancement Spot - TECO POP up
Hi Pete For modifying the TECO proposal date we have used include LCOIHFG5 line 57 and for disabling the change in TECO date we have used include LCOIGFG8 in the FM co_IO_arch_popup line number 298...
View ArticleRe: Install equipment at Functional locations
Thanks for the replies. But just to clarify the requirement more... Even if we made mandatory the Maintenance Plant, User would be able to add different plant. And equipment are not create against the...
View ArticleRe: Issue against Order
by movement type 201, you have already consumed components against a cost center. Now these components can not be booked anywhere. In above mentioned scenario, you can create a separate storage...
View ArticleRe: Install equipment at Functional locations
This is more of user understanding than SAP restriction. User can assign 2nd plant & trying to install to functional location of 1st plant can be controlled. Master Data creation or change should...
View ArticleRe: Service description (number, short text) missing in line 0000000000
hi have you specified the service description or service master number while creating the PO , also if possible provide the screen shot of Frame work order and i think you are creating the SES from...
View ArticleRe: Technical identification number in Notification
Are you looking for something else here?? Please update if you have any query.
View ArticleRe: Issue against Order
Hello, akhil Rao wrote: I have an issue one of my user asked a question which i could not find solution If i have taken some components by using mb21 and movement type 201 and kept with in the plant...
View ArticleRe: Install equipment at Functional locations
You have to put a custom check at the time of installation between F/L and equipment maintenance plant. The check should happen when equipment has a status =AVLB and target status is INST. Hope this...
View ArticleRe: scheduling operation during break interval
Yes,You can maintain break times only in PP (i.e which tiime to which time). In work center we only maintain break duration. I mean operation early start date-Time and early finish-date-time . My...
View ArticleTask list and work order operation
Hi all, I'm creating a Report Z in PM module. I need to know the link, through tables, between task list operations and work order operations created from task list. I'll be very grad for all your...
View ArticleRe: Task list and work order operation
You can get the Task List details which has been assigned to PM Order using AFKO table. Give the complete details of linking PM Order operations & Task List operations on what exactly trying to...
View ArticleRe: scheduling operation during break interval
NP, Where in PP did you maintain these breaks? PeteA
View ArticleError with MB1A while budget check by using WBS element.
Hi experts,Can anyone please me to solve problem with budget check by using WBS element.I have assigned some budget to a WBS Element and assigned the WBS element in WBS field in Additional tab in...
View ArticlePurchase Requisition from Maintenance Order issue
Dear Expert In a maintenance order How purchase requisition can be triggered for a material if a required material is not available in stock.Also, Please give your valuable thought on differencce...
View ArticleWCM (T Code - WCLC ), what is logic before selecting the printer while...
Dear All, enter t code WCLC check mark no approval is issued , created and input planning plant and also input type of wcm object as wc document -Isolationpress F8 (execute)select one wcd and...
View ArticleMaterial issue in maintenance order
Dear ExpertsIn a maintenance order if i have planned for spare material of 1 quantity.But store deptt. by mistake issue more than 1 quantity. System is allowing to issue more quantity than planned...
View ArticleRe: PM Runtime error when edit component price in maintenance order
Dear pete thanks for reply , but I found solution actuly it was standard SAP bug so to eliminate this we neet to install a patch.
View ArticleRe: after GR/Service entry sheet for external operation in PM Order no...
Dear All thanks for your comments .
View ArticlePurchase Requisition from Maintenance Order issue
Only for spare parts, you can mention the Item category either L (Stock Item - Reservation) or N (Non stock item - PR). You can't mention Item Category for Service.
View Article