Re: CM02 -Capacity Planning
Hi Narasimhan, I am trying to look at capacity requirements for a time period in the past. What transaction codes would I use for that? I am looking for output similar to CM01 but I don't think this...
View ArticleRe: Unable to see costs of labor and material in Plant Maintenace work order
Hi Pete I tried everything you folks have advised. However, I am unable to bring in the labor and material cost. Please see the attached document screen shot. Appreciate your helpChandra
View ArticleRe: Unable to see costs of labor and material in Plant Maintenace work order
Consing Variant Planned & Costing Variant Actual assignment is missing at order type level in your 1st screen shot. The assignment (which you shown in 4th screen shot) of Costing variant to order...
View ArticleRe: Single cycle count scheduling
As I mentioned already, during Maintenance, because of some test run, some counter might have been consumed. Even there is no change in counter value, measurement document during TECO only will update...
View ArticleHow can I consume consignment material (K) directly in IW41 ?
We can enter consignment material in IW21 but when going to IW41 in the Good Movements the rows are empty. I understand I have to activate a SPRO to be able to use Maintain Mov Type for PM/CS Ord, and...
View ArticleRe: Single cycle count scheduling
Scenario 2 is wrong. Even though while doing TECO PM Order, measurement reading value is 600, as it has not been updated through TECO pop up, system will generate the next order at 1128.
View ArticleRe: Single cycle count scheduling
I hope we had enough discussions & enough explanations have been given. So, try different scenario from your side & see the results instead of asking us about the results of different scenario....
View ArticleStandard Reports
Hi, Is there is any standard report in PM to get maintenance expenses and spate parts consumption for each Equipment/ Functional location wise ? What is standard report available to find downtime...
View ArticleRe: Standard Reports
Maintenance Expense - IW39 / IW38 / MCI3 / MCI8 Spare Parts Consumption - IW13 Downtime Reports - MCJC / MCJB
View ArticleRe: How can I consume consignment material (K) directly in IW41 ?
Thank you Murad, Now I see I can enter consignment components in IW41, but how to consume them? My stock is still in the Storage Loc. Regards,Carlos
View ArticleQQMA0011 - Number of fields
Dear AllWe are planning to introduce some user defined fields in Notifications & Notification Tasks. We are in the design phase so we do not have any technical consultants with us. My question is,...
View ArticleRe: QQMA0011 - Number of fields
Hi Goraj,You can use only TWO lines. You need to accommodate all your required fields in these 2 lines as show in the picture below.Also these posts will be of use to you.User-fields in Catalog Tabs...
View ArticleRe: QQMA0011 - Number of fields
Hi Jogeswara Rao KThanks for this great input. So as it does not allow us to cover multiple equipment/functional location records. But it seems that we can possibly referto a custom table. Assume that...
View ArticleQQMA0011 - Notification Task User Exit / Custom Fields - Dependencies
Dear AllPlease refer to my initial question:http://scn.sap.com/message/15149603Jogeswara Rao Kavala had a very nice input on that question.Now the next question is about building relationships between...
View ArticleRe: QQMA0011 - Number of fields
Hi Goraz,In a simple way you are asking thatWhether we will be able to call reports upon D'clicking on the Additional fields of the QQMA0011?You should be able to do that by writing your code in PBO...
View ArticleRe: Error at the time of notification completion.
Exactly.For this only I tried to simulate. So question remains if it is not QQMA0014, where-else these people have arranged this check? May be some BAdi implementation. You should take help of ABAPer...
View ArticleRe: Error at the time of notification completion.
Hi MoazzaM,If you are sure that it is not the User-Exit, then investigate BAdi BADI_CCM_NOTIF_GENER for any possible implementations which is triggering this error. See the spro picture attached.
View ArticleDelete assignment of work approval document to Maintenance Order
Hello Experts, In wcm(enhanced model), I have created and assigned one work approval to Maintenance order.Now I am not able to delete the assignment to the maintenance order. I have checked both the...
View ArticleRe: Error at the time of notification completion.
MoazzaM, Also try SE91 and enter "IM" in the Message Class and "277" in the Message Number, then press the Where Used List button. Send us a screen-shot of the results PeteA
View ArticleRe: Unable to see costs of labor and material in Plant Maintenace work order
Hi Friends, I am partially successful in the sense, am able to display costs. However I think this is not correct since the Internal labor cost is not displayed instead, "Not Assigned" cost is...
View Article