Re: Error in deadline monitoring for Maintenace plans
The frequency as is said is mentioned in strategy and i scheduling period has to be taken from each plan. i am giving two weeks in interval for call objects ,i think that will release for the next...
View ArticleRe: Error in deadline monitoring for Maintenace plans
Suggest you to take any one of the plans (which giving the error) & try the above mentioned options. Then, you can able to trace out the problem. If you have multiple plans, then its not possible...
View ArticleBreakdown -SAP PM
Hi , Can Any Guide Me on breakdown of equipment. If a equipment goes on Breakdown immediate actions are required to to make Equipment in Functioning. But if some material is consumed how can we track...
View ArticleRe: Breakdown -SAP PM
Dear Ashu, Complete history of material consumption can be tracked using T-Code MB51.Just enter Material number which is consumed. You can also enter movement type there.Movement type for material...
View ArticleRe: Breakdown -SAP PM
What kind of history you want to track?? If you want to track material usage on specific equipment for specific period, use IW13 report.
View ArticleRe: Error in deadline monitoring for Maintenace plans
I tried the above ways that you have suggested and it is working good,i need clarity on few things,can you help me out 1.I am selecting 2 weeks in interval in call objects ,will that only release...
View ArticleRe: Error in deadline monitoring for Maintenace plans
Just try one of the Maintenance Plans in IP10 by doing manual scheduling. If the result comes as you expected, then you can do the same for multiple plans in IP30.
View ArticleRe: Activate GL account field in IW31
Hi, Can anybody confirm if there is an option to activate the GL account field in IW31 / MIGO / MB1A for the situation that I've mentioned? Regards
View ArticleRe: Activate GL account field in IW31
Hi Pearl T, It is not required to Input G/L account while doing MB1Asystem will automatically fetch respective G/L account from OBYC settings where your MM guys will input G/L account against your...
View ArticleCost Calculation in Maintenance Order
Hi Experts,In maintenance order operations I have maintained control key pm01 and also maintained activity type(Internal Wages),system calculating the cost but when I check in mci1 report cost goes to...
View ArticleRe: Cost Calculation in Maintenance Order
Check the Value Categories maintained for Internal Wages in IMG - PM & CS - Maintenance & Service Processing - Basic Settings - Settings for Display of Costs - Maintain Value Categories /...
View ArticleRe: Breakdown -SAP PM
Hi Ashu,But if some material is consumed how can we track the history , as material is already available with us from stores.This sentence of yours sounds like your material already consumed on Cost...
View ArticleRe: Error On Click Rep. Budget / Commit. tab under Cost Tab & Settlement of...
Try going to the FICO section in the SAP Standard Menu tree and find the Budget/Commitments reports - then try to run them. Hopefully this should copy the reports from the 000 client. Then go back to...
View ArticleRe: creating a serial number without equipment in iq01
Hi Naga, This link might be useful to you.Serial number configuration | SCN Jogeswara Rao K
View ArticleRe: creating a serial number without equipment in iq01
What kinds of business transactions you trying?? As some of business transactions require Equipment category, you can't avoid creation of equipment for those. Please check in OIS2 about the serial...
View ArticleRe: Steps for Material Availability Check while saving Work Order
Hi Maheswaran,Thanks for your reply.I did the same, But the last step "Maintain the availability Check in MM for MRP View ", I dont see MRP3 for Material created. Please guide me on this. With...
View ArticleRe: Steps for Material Availability Check while saving Work Order
MRP views might not have been added to your material. Either extend those views in MM01 or discuss with MM consultant to extend these.
View ArticleChanging Cost Center and Activity Type in Confirmation
Hi, Is is possible and ok to change the cost center and the activity type during operation confirmation? We want the actual cost to be calculated based on a activity type in a cost center which is...
View ArticleRe: Changing Cost Center and Activity Type in Confirmation
You can change the activity type in Confirmation if you have assigned that activity type as well in work center. System will pick the cost center from the work center only. So, you have no provision to...
View ArticleRe: Steps for Material Availability Check while saving Work Order
Hi,Thanks for your guidence. I maintain the same in Mat Master and before creation of Work order , I check the stock and is ZERO.I created work order with 20 qty and expecting to trigger error message....
View Article