Quantcast
Channel: SCN: Message List - Enterprise Asset Management (SAP EAM)
Browsing all 10043 articles
Browse latest View live

Re: Task List by Standard Batch/Direct Input

HI Chin and Thyagarajan, Thanks for your support, Converted data from LSMW can be seen in Transaction AL11, -> DIR_SAPUSERS                 ./Double click the DIR_SAPUSERSWe can sort by date and...

View Article


Re: Task List by Standard Batch/Direct Input

HI Chin and Thyagarajan, Thanks for your support, Converted data from LSMW can be seen in Transaction AL11, ->DIR_SAPUSERS                 ./Double click the DIR_SAPUSERSWe can sort by date and time...

View Article


Message no. IM258, Object does not exist (status management)

Hi, We faced a issue in opening a Notification. We received a Error, Object does not exist (status management) Message no. IM258. We applied the Note 437878 - Status data missing for PM/CS...

View Article

Fleet Management - MM integration

When execute tcode IFCU and inform gas station I think will occur movement type 261 based in sequence Gas Station=>Plant=>Storage Location.Where is the link between the fuel (e.g. diesel) and the...

View Article

Re: Fleet Management - MM integration

Please check the settings under PM & CS - Master Data - Technical Objects - Settings for Fleet Management - Create Gas Stations / Assign Auxiliary Materials & Consumables

View Article


Re: Message no. IM258, Object does not exist (status management)

There is no specific reason, it seems. It can happen when there is an inconsistencies in status across tables. These can happen by any means of Business transactions.

View Article

Re: Message no. IM258, Object does not exist (status management)

Hi, You can also check the date when you have applied the changes in user status and creation/change date of notification. Regards,Sandeep V

View Article

Re: Message no. IM258, Object does not exist (status management)

Raja Have a look at this OSS Note: http://service.sap.com/sap/support/notes/1930617 PeteA

View Article


Re: Plant Maintenance Checklist in PM Plan

Atul Rajmane, You have the option to try all kinds of plans in Sandbox / Test client accordingly, you can decide to go with which kinds of plans. Also, there are many links explaining about strategy...

View Article


SAP PM order without equipment number

Hello Experts, I am trying to create PM orders without any equipment number. The idea is to capture costs in the order. The information I have is a functional location, material number and cost center....

View Article

Re: SAP PM order without equipment number

why can not you assign an equipment to order ?  what is the error you are getting when you do Goods movemnet ?  Linganna

View Article

Re: SAP PM order without equipment number

Thank you for the response.The client has requested to be able to create an order without any equipment number as these are for one time walk in PM repair orders. They only have material number, cost...

View Article

Re: SAP PM order without equipment number

Assign the cost center in Functional location master data if that cost center represents Functional location. Create the PM order / Notification with Functional Location. Assign the components in PM...

View Article


Re: SAP PM order without equipment number

Thank you! So I dont even need the material number?

View Article

Re: SAP PM order without equipment number

Yes, Megha. No need of material, if you are using functional location/equipment.

View Article


Re: SAP PM order without equipment number

Material Number for what?? Spare Parts which is getting consumed or something else (Functional Location / Assignment Object)?? For Spare Parts, you need material number. In Objects, only Functional...

View Article

Image may be NSFW.
Clik here to view.

Re: TECOing Service Order - Error V1882 repair indicator 03 is not defined

Santosh,Thank you so much!  I found the item category (TAN) and in our configuration there is no repair procedure in that item category so I'n not sure which of the four proecdures is being called....

View Article


Performance issue

Hi All, I have around 25,000 maintenance items.I need data of total work hours for year 2014( Jan'14 to Dec'14). I have divided into 4 parts.Means each part contains approx. 6,000 nos of maint....

View Article

Image may be NSFW.
Clik here to view.

Re: Refurbishment Order -> Direct assignment of Task List

Hello, In addition to above statements... 'First' operation will not be deleted if you are adding task list to refurbishment work order... If you do the same for non-refurbishment order with system...

View Article

Re: ABAP DUMP

During Switch Framework activation, you should avoid having users on the system or jobs running  (quiet system)since programs are touched and need to be regenerated.This could be the reason for the...

View Article
Browsing all 10043 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>