Pete,
In my earlier project, 3 activity types have been created viz., High skill, skilled, low skilled & used in PM Orders.
Table in Costing tab had been used to assign those 3 activity types & in PM order, anyone will be selected as per the operation.
It works as same as assigning the single activity type. So its possible to have multiple activity types per work center.