Bikas Kumar Pathak.
The planned overhead costs are derived from costing sheet assigned to the order (see control tab)
The costing sheet uses the planned costs on the order to determine the overhead costs.
The costing sheet is configured in the IMG, usually by the finance team.
PeteA