Order has CSER status with Material Cost 47.20 $ when I ran OLI5 it was same 47.20$ (I don’t know why it is not considering Std Personnel cost).
When I open Work order and hit calculator, it shows correct Plan cost (include/add Personnel Cost 125 $ and Material Cost 47.20$) = 172.20$