Bruno,
Or update all notifications after the breakdown data has been entered in the 1st notification. TECOing of the order is then done in a 2nd step.
PeteA
Bruno,
Or update all notifications after the breakdown data has been entered in the 1st notification. TECOing of the order is then done in a 2nd step.
PeteA