Re: Material Provision Indicator

$
0
0

Hi All,

 

This is the refurbishment Process the error will come material provision indicator is not defined , once you defined again it will the same.

 

In some of the Version or ECC 6  the error will be coming , But SFW5 you need to activate some components which are from MM side then the error will not come.

 

After activating the node , then in the general tab you will find the material provision indicator which will not be in grey mode then select the sub-contracting, Then in the external tab click on the sub-contracting check box.

 

So once you are sending the material outside you need to check the subcontracting check box, then only the process will work.

 

After that we can do the MM process by ADSUBCON t-code which you will be sending the material outside and bringing the material inside with the same serial no.