There is no option with existing plans. As mentioned already, single cycle plan will not consider the other plan created for same equipment.
You can use LSMW, script, mass change of maintenance plans, etc., to make the existing plans into Inactive.
There is no option with existing plans. As mentioned already, single cycle plan will not consider the other plan created for same equipment.
You can use LSMW, script, mass change of maintenance plans, etc., to make the existing plans into Inactive.