Quantcast
Channel: SCN: Message List - Enterprise Asset Management (SAP EAM)
Viewing all articles
Browse latest Browse all 10043

Re: Assign Measuring Point to Maintenance Plan.

$
0
0

I feel for such requirements the scheduling frequency should be as high as possible, to reduce the gap between the time of entitled measuring document (to trigger the notification), and the time of notification triggering.

If I am right, the scheduling frequency can be even in hours as per the requirement.

 

Jogeswara Rao K


Viewing all articles
Browse latest Browse all 10043

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>