I feel for such requirements the scheduling frequency should be as high as possible, to reduce the gap between the time of entitled measuring document (to trigger the notification), and the time of notification triggering.
If I am right, the scheduling frequency can be even in hours as per the requirement.
Jogeswara Rao K