Hi,

 

I have created 2 notification on 01.06.2013. Both of then have 1 hour breakdown each and breakdown is also ticked. Each breakdown is of 1 hour each.

 

Though there are 2 breakdown, in the report MCI7 it shows only 1 breakdown and the Time to repair is shown as 1.233 H and Mean time to repair 1.233 H.

 

Can some one please explain, why system shows the data as above instead of showing 2 break downs, time to repair as 2 H and mean time to repair as 1 H.

 

Regards,

Naren